[new]11/21 Lab Lecture 13 Slides are up. Project Report Description is here. Reports are due at 4pm on Fri 12/5 both on paper/in person in 125 Cory and electronically to your project submission directory. The electronic version need not have all your diagrams, come to lab lecture for details.

[new]11/19 File submission directories are availible. Check the group signup sheet for your official group name. Submit only *.V, *.EDN, etc source files. Submit path: "\\fileservice\cs150\cs150\2003Fall\[YourGroupName]". ALL FILES MUST BE SUBMITTED BY 10am ON YOUR CHECKOFF DAY.

[new]11/17 Project checkoff instructions and signups are now availible. You must sign up for a group name by Thursday 11/20 at 11am to be able to submit your project. Submission details will be posted Thursday 11/20 by 5pm. Please read the instructions carefully.

[new]11/17 Add this module at the end of your testbench if you're having trouble with glbl.GSR. Apologies for leaving it out of lab lecture -Greg.

module glbl();
    wire GSR;
endmodule

[new]11/12 Motion test stream generator posted: bitfile instructions

[new]11/19 There is lab lecture on Friday. More project checkoff information! Also, we'll go over the project report.

[new]11/10 Grade distribution for Quiz 2 posted (corrected).

[new]11/09 There will be no official lab or discussion on Tuesday, Nov 11 due to Veterans Day.
Some TAs may still be around.
Read the newsgroup for design review 4 (last one) requirements.

[new]11/07 Quiz 2 mean 73, s.d. 18. Solutions available in lab lecture.

[new]11/06 Minor bug in the distributed encoder. If you're using it try the new version...

[new]10/31 Checkpt 4 and 5 changes.
No change to design reviews as listed in project spec.
Due to quiz, checkpoint 4 demo now due by Mon. 11/10 (11/11 is holiday)
Checkpoint 5 demo dropped.
Final demo changed: Demonstrate block motion estimation on 2 consecutive frames at a 1 Hz rate and show motion vectors on video display. (by Fri. Nov.21 for early completion bonus, or by Wed. Nov. 26.)
+5 bonus for 30 Hz update rate during your demo time.

[new]10/30 Reminder: Quiz 2 in class Nov. 6, closed book and closed notes.

[new]10/24 Checkpoint Due Date Update (Tell your friends)
Checkpoint2 is due today at 4pm, We will post our encoder at 4pm sharp you may checkoff through tuesday for 75% credit with OUR encoder
Checkpoint3 will be due Tuesday 11/4 for FULL credit
Checkpoint4 will be due Friday 11/7 but will be TRIVIAL

Please remember to get some sleep

[new]10/24 Checkpoint #3 and Lab Lecture #9 are up.

[new]10/23 Link added to RISC SPM assembler under Links

[new]10/21 Utility modules have been updated to include SRL16E

[new]10/18 Utility modules required for the project posted on the left.

[new]10/16 Checkpoint2 files and slides are up and final! Feel free to start reading...

[new]10/11 Checkpt1 demo due by Friday 10/17 for full credit. Extra Friday TA hours for checkoffs 11-12, 1-2, 3-4. Last checkoff slot available is 350 pm Friday.

[new]10/11 See newsgroup for check point 2 design review details.

[new]10/8 Project references page added.

[new]10/8 Grade distribution for Quiz 1 posted.

[new]10/7 Project handouts and descriptions today in class! Be there!

[new]10/4 The Project Demo is now working in the lab. Tune to channel 20 on the LCDs and see...

[new]10/3 For information about the Verilog HDL, Video, Synplify and more please see Useful Documentation under the links heading at left.

[new]9/5 All discussions meet in 125 Cory from now on (as stated below).

[new]8/26 Lab 11 moved to 8-11 am Tuesday, Lab 15 moved to 8-11 am Thursday. Mon 9-10 discussion section cancelled.

[new]8/28 All labs and discussions meet in 125 Cory. Lab lecture on Friday 8/29 meets in 125 Cory. There are no discussions on Monday 9/1 (Labor Day).

[new]8/21 Discussion sections and labs start week of 9/1/03.

[new]8/19 web page started.