Section | Day | Time | Location | Instructor / TA | Online
Webcast and Archive |
---|---|---|---|---|---|
Lecture | M/W |
|
10 Evans Hall |
John Kubiatowicz | Pointer
to Webcasts |
Section | Day | Time | Location | Instructor / TA |
---|---|---|---|---|
101 |
Tu |
1:00-2:00P |
310 Hearst Mining |
Dominic |
102 |
W |
10:00-11:00A |
2 Evans Hall |
Rajesh |
103 |
W |
11:00-12:00P |
85 Evans Hall |
Rajesh |
104 |
W |
1:00-2:00P |
85 Evans Hall |
Chris |
105 |
W |
2:00-3:00P |
85 Evans Hall |
Chris |
Lab | 271/273 Soda Halll |
Required |
Textbook |
Authors |
Bibliographical
Information |
|
---|---|---|---|---|
Yes |
Operating System Concepts 7th Edition | Silberschatz, Galvin, and Gagne | John Wiley &
Sons, ©2004 ISBN 0-471-69466-5 Online material (Appendices, code examples, etc) Note: Students may use the older 6th edition with Java, or the XP update, 6th edition. |
|
Suggested |
The Design and Implementation of the 4.4 BSD Operating System | McKusick, Bostic, Karels, and Quaterman | Addison-Wesley,
©1996 ISBN 0-201-54979-4 |
|
Suggested |
The Practice of Programming | Kernighan and Pike | Addison-Wesley, ISBN 0-201-615686-X | |
Suggested |
The Mythical Man-Month | Brooks |
Anniversary Edition, Addison-Wesley, ISBN 0-201-83595-9 | |
Suggested |
Just
Java 2, 6th Edition |
Van Der
Linden |
Prentice Hall, ©2004, ISBN 0131-48211-1 |
Projects: There will be four projects. Each project consists of a design document and solution code. The document will be worth 40% of the project grade, and the code will be worth the other 60%.
Exams: There will be one midterm exam and one final exam. If you have a conflict with either exam, let us know, and we will schedule a makeup for the day before the exam is given to the rest of the class. All exams will be closed book, and will cover material from lecture, sections, the readings, and the project. In particular, you are likely to do poorly on the exams and in the course if you do not do your share of the work on the project.
Two Midterms: | 30% | (each worth 15%) |
One final
exam: |
15% |
|
four project phases: |
50% |
(each project is worth 12.5%) |
Class and Discussion Section
Participation: |
5% |
Last Updated: 8/29/05