| Allegro CL version 6.2 Unrevised from 6.1 |
The Project Manager dialog displays information about the current project which is returned by current-project. Most information about projects is displayed and much can be changed by changing fields in the dialog.
As shown in the illustration, the Project Manager has four tabs, General, Options, Build, and Advanced.
The buttons on the Project Manager toolbar are (identified by their tooltip label and, in some cases, their icon):
Use the Move Up (up arrow) and Move Down (down arrow) buttons to place the new module in the desired location with respect to other modules.
Copyright (c) 1998-2002, Franz Inc. Oakland, CA., USA. All rights reserved.
Documentation for Allegro CL version 6.2. This page was not revised from the 6.1 page.
Created 2002.2.26.
| Allegro CL version 6.2 Unrevised from 6.1 |