In case lecture listed below cannot be conducted on schedule, appropriate arrangements for the lecture will be made. These will likely entail make-up lectures, possibly in the evenings.
|
Week
|
Dates
|
Lecture
|
Notes
|
PDF
(marked)
|
Reading (Razavi)
|
Reading (GLHM)
|
Homework and Lab
|
1
|
Jan 17 Jan 19
|
Administrative Information, Introduction/Overview: What is 140 all about? Op-amps circuits in lab-1
|
|
PDF
PDF
|
Ch-1 Review Ch-§2.1-2.3
|
Page xiv symbol conventions 1.5, 1.6 MOS large & small signal models skim chapter 3
|
Hw-1 Lab-1
|
2
|
Jan 22 Jan 24 Jan 26
|
Taylor, Heaviside, and Bode Diode, BJT and MOS physics, MOS small-signal model(s) and body-effect
|
ROI Chart: PDF pptx
|
PDF
PDF
PDF
|
Ch-§2.4-2.6 (Skim 2.5 & 2.6)
|
Ch-§1.2
|
Hw-2
|
3
|
Jan 29 Jan 31 Feb 2
|
Common-source single pole amplifiers, frequency and step response
|
|
PDF
PDF
PDF
|
Ch-§3.1-3.4 (esp. figures 3.5, 3.6, 3.18-3.20) Ch-§6.2 through eqn 6.22
|
Ch-§7.1, 7.2.1 up through eqn.7.27 Ch-§3.1, 3.2, 3.3.2
|
Hw-3 Lab-2
|
4
|
Feb 5 Feb 7 Feb 9
|
Common-Source: input pole, input capacitance, Active load
|
Inspection of CS, CG & CD
|
PDF
PDF
PDF
|
|
3.3.5 (eqns. 3.55 and 66), 3.4.2.2 (eqns 3.126, 127, 128) Figure 4.17
|
Hw-4 Lab-3 (part-1)
|
5
|
Feb 12 Feb 14 Feb 16
|
Common-gate; Review Midterm-I:1 page notes, 2 sides
|
Frequency Response Notes
|
PDF
PDF
|
|
|
Spring 2008: Midterm-Exam
Solutions
Fall 2009:Midterm-Exam Solutions
Spring 2015: Midterm-Exam Spring-2016: Ex1
Ex2
Ex2soln
|
6
|
Feb 19 Feb 21 Feb 23
|
Presidents Day: No classes Current mirrors, Differential pair, Differential amplifier
|
Midterm-1:Exam
Soln
|
PDF
PDF
|
Ch-§5.1 esp. Figures-§5.5, 5.7, 5.10 and 5.11 Ch-§4.1,4.2 through
Figure-§4.14
|
Ch-§3.5.{3-5} MOS diff pair (eqn. 161, 171-174) (eqn. 188-191, 199-201) (Fig 3.51)
Ch-§4.2.2.2 MOS current mirror (eqn. 17-20) 4.3.1, 4.3.5.2 Active loads (eqns 143, 149) Ch-§4.1,4.2 through
Figure-§4.14
|
Hw-5
|
7
|
Feb 26 Feb 28 Mar 2
|
2 stage op-amp frequency response feedback, stability compensation
|
Miller Compensation
|
PDF
PDF
PDF
|
Ch-§6.2 Ch-§10.1-10.6
|
Ch-§6 read 6.1.1, skim through eqn 6.25, Ch-§6.3 through 6.3.5 inclusive 8 through 8.2 inclusive 9.1,2
|
Hw-6 Lab-3 (Part-2)
|
8
|
Mar 5 Mar 7 Mar 9
|
2 stage op-amp, Common-mode and Differential gain, RHP zero from Cc
|
|
PDF
PDF
PDF
|
Ch-§5.3 esp. Figures-§5.23, 5.29 and 5.30}
|
Ch-§9.3 through 9.4.3 inclusive
|
Hw-7
|
9
|
Mar 12 Mar 14 Mar 16
|
RHP zero, Current mirror pole/zero doublet, Supply-independent biasing
|
|
PDF
PDF
PDF
|
|
4.4.2, 4.4.3 biasing; with emphasis on the MOS parts
|
Hw-8 Lab-4
|
10
|
Mar 19 Mar 21 Mar 23
|
Supply & Temperature Indep. Biasing Midterm Review Midterm-II: 90min exam. Class-period is extended.
|
Banba JSSC May 1999
|
|
|
|
Spring 2008: Midterm-II
Spring-2015:Midterm-II
Spring-2016: Midterm-II
Spring-2017: Midterm-II
|
11
|
Mar 26 Mar 28 Mar 30
|
Spring Break
|
|
|
Snow
|
Snow
|
Snow
|
12
|
Apr 2 Apr 4 Apr 6
|
Telescopic & Folded cascode, Folded cascode biasing, Switched capacitors, ADCs and DACS, Regulators
|
ADC
SAR ADC
|
PDF
PDF
PDF
|
Ch-§5.1-5.2 and Ch-§9.2
|
Ch-§6.1.7.1 Switched capacitor amplifier 6.6 folded cascode
|
Hw-9 Lab-5
|
13
|
Apr 9 Apr 11 Apr 13
|
Switched capacitors: ADC, PGA, MOS switch
|
|
PDF
PDF
|
Ch-§13.2
|
Ch-§4.2.5.2 high swing current mirrors
|
Project
|
14
|
Apr 16 Apr 18 Apr 20
|
Rail-to-rail input and output, Ri, Ro, and feedback noise
|
|
PDF
PDF
PDF
|
|
|
|
15
|
Apr 23 Apr 25 Apr 27
|
Op Amps: Input Offset Voltage; Finite Gain-BW Product, Freq. Response in FB
|
|
|
|
|
|
16
|
Apr 30 May 2 May 4
|
RRR Week Project Presentation
|
|
|
|
|
Final Spring 2016
Final Spring 2017
Final Fall 2009
Final Spring 2015
|
|
|
Final Examination Date: May 11th, 8:00am - 11:00am Location: Cory 241
|
|
|
|
|
|