Dates with an asterisk next to them represent those days that I will not be in town. On these dates I will make appropriate arrangements for the lecture. These will likely entail make-up lectures, possibly in the evenings, but since this course will be webcast, you can always watch the webcast if you cannot attend on the make-up date.
|
No.
|
Date
|
Lecture
|
Module
|
PDF
(marked)
|
Reading
|
1
|
Aug. 29
|
Administrative Information, Introduction/Overview: Op Amps
|
|
PDF
PDF
|
|
2
|
Sep. 3
|
Dev. Operation & Models: BJT & MOS
|
PDF
|
PDF
PDF
|
G&M: §1.1-1.6, R: Chpt. 2
|
3
|
Sep. 5
|
Dev. Operation & Models, Inspection Analysis
|
|
PDF
PDF
|
G&M: §1.1-1.6, R: Chpt. 2
|
4
|
Sep. 10
|
Bipolar Inspection Analysis
|
|
PDF
PDF
|
G&M: §3.1-3.3, R: §3.1-3.4, §6.1-6.4
|
5
|
Sep. 12
|
MOS Inspection Analysis
|
|
PDF
|
G&M: §3.4, R: §3.5-3.6
|
6
|
Sep. 17
|
Freq. Response Inspection Analysis I
|
|
PDF
PDF
|
G&M: §7.1-7.3, R: §6.5
|
7
|
Sep. 19
|
Freq. Response Inspection Analysis II; Active Loads
|
|
PDF
|
G&M: §4.3
|
8
|
Sep. 24
|
Active Loads: 1-Tx and Multi-Tx Loads
|
|
PDF
|
G&M: §4.3
|
9
|
Sep. 26
|
Current Sources
|
|
PDF
|
G&M: §4.2, R: §5.1-5.2
|
10
|
Oct. 1
|
Supply & Temperature Indep. Biasing
|
|
PDF
|
G&M: §4.4.2-4.4.3, R: Chap. 11
|
11
|
Oct. 3
|
High Swing Current Sources
|
|
PDF
|
G&M: §4.2.5.2, R: §5.1-5.2
|
12
|
Oct. 8
|
Current Source Matching
|
|
PDF
PDF
|
G&M: §4.2.5.2, R: §5.1-5.2
|
13
|
Oct. 10
|
Op Amps: Op Amp Feedback Circuits; ECP, Half Circuits
|
|
(Pre-Lecture)
PDF
PDF
| G&M: §A.4.1
|
14
|
Oct. 15
|
Op Amps: SCP; Current Mirror Load
|
|
PDF
PDF
PDF
|
G&M: §6.1-6.2, §3.5, R: §4.1-4.4
|
15
|
Oct. 17
|
Op Amps: Input Offset Voltage; Finite Gain-BW Product, Freq. Response in FB
|
|
(Pre-Lecture)
PDF
PDF
|
G&M: §4.3.5
|
16
|
Oct. 22
|
Op Amps: High Gain Designs; Compensation (a 1st pass)
|
|
PDF
|
G&M: §3.5.6, §A.4.2, §9.2
|
17
|
Oct. 24
|
Op Amps: Slew Rate (a 1st pass) & Output Stages
|
|
PDF
|
G&M: §6.3-6.7, R: §9.3-9.4
|
18
|
Oct. 29
|
Compensation: Stability of FB circuits, Narrowbanding
|
|
PDF
|
G&M §9.4.1-9.4.2, §9.6.1-9.6.2, R: §9.7-9.8
|
|
Oct. 31
|
Midterm Exam
|
|
|
|
19
|
Nov. 5
|
Compensation: Pole-splitting Pole/Zero Plots
|
|
PDF
|
G&M §5.1-5.5
|
20
|
Nov. 7
|
Compensation: For CMOS Op Amps, ChoosingCc
|
|
PDF
|
G&M: §9.4, R: §10.1-10.3
|
21
|
Nov. 12
|
CMOS Op Amp RHP Zero
|
|
PDF
PDF
PDF
|
G&M: §9.4-9.5, R: §10.4
|
22
|
Nov. 14
|
RHP Zero
|
|
PDF
|
G&M: §9.4.3-9.4.5, R: §10.5-10.6
|
23
|
Nov. 19
|
Slew Rate (Revisited) & Settling Time
|
|
(Pre-Lecture)
PDF
PDF
|
G&M: §9.4.3, R:§10.5-10.6
|
24
|
Nov. 21
|
Settling Time, PSRR & Feedback I
|
|
PDF
PDF
|
G&M: §9.6
|
25
|
Nov. 26
|
Feedback Z
|
|
(Pre-Lecture)
PDF
PDF
|
Handout, R: §9.9
|
|
Nov. 28
|
Academic and Administrative Holiday
|
|
|
|
26
|
Dec. 3
|
Feedback by Inspection
|
|
PDF
PDF
(Feedback handout)
|
Handout, G&M: §8.1-8.2, §8.4 R: §8.1-8.2
|
27
|
Dec. 5
|
Feedback Examples
|
|
PDF
|
G&M: §8.5-8.6, R: §8.1-8.3
|
|
Dec. 10
|
Reading/Review/Recitation
|
|
|
|
|
Dec. 12
|
Reading/Review/Recitation
|
|
|
|
|
Dec. 17
|
Final Exam: Tuesday, Dec. 17
3:00-6:00 p.m. (Exam Group 7)
|
|
|
|